Rebranding

From NeoWiki

Revision as of 12:27, 16 November 2005 by Sardisson (Talk | contribs)
Jump to: navigation, search
  • Change text on Main Page just before 1.2 Alpha
    We need new text for the tag line there, and perhaps for the NeoOffice/J page
    • Ditto with NeoOffice/J Release Notes
      this will be done via the standard Release Notes Move/Rename procedure
    • Update just before 1.2 Alpha with the latest Java/Cocoa info
  • Use the Move function to move (rename) pages that have /J in their titles
    • Delete redirects in December/Jan after everyone has time to update links
  • System Reqs: remove 10.2 on any page describing 1.2 Alpha
    • OK for "historical" pages describing 1.1
  • ~/Library/NeoOfficeJ-1.1 --> ~/Library/NeoOffice-1.2
    • ~/Library/NeoOfficeJ-1.1 --> ~/Library/Preferences/NeoOffice-1.2 - we need to check any of the earlier pages and fix this again, if I fixed it earlier....
  • NeoOffice/J menu --> NeoOffice menu (sa: need new screenshots)
    This is mostly in the subpages
  • Include "rebranding" in your edit notes
  • Ensure that the French wiki is also updated before 1.2 Alpha
    • Exercise caution when moving pages that have a French translation already
      the French wiki is expanding rapidly, and all the pages might not be properly tagged as equivalents
    • Both the French and English versions will need their links in their botlangbar templates updated
  • Keep the "Category" as /J for now

Also:

  • SW Listings (VT/MU/Apple/FM) when 1.2 Alpha comes out
  • Get the links on the sidebar on http://www.neooffice.org fixed once all the moving is done
    some links still point to page names that are no longer in use!

Completed

aside from changing links that are redirects after the renaming of other pages

Partial

"Historical" pages that won't be changed

  • Old Release Notes
  • Neo/J 1.1 Release Announcemnt, etc.
  • NeoOffice/J Press Kit (until next Neo final release)
    I think what we should do here is use the "Release Notes" method of page updating once we get close to 1.2 Alpha: move the existing Press Kit to "Neo/J 1.1 Press Kit" and then start a "new" "NeoOffice Press Kit" for 1.2 Alpha/Final, based on the existing content of the 1.1 Kit. Then we'll always have a full snapshot of the press materials for a specific release (as opposed to recovering the state via the wiki history) as well as a current version.
Personal tools